Projects

January-December 2023 Bergkamen and Chemiepark Marl maintrance in 2023 in power plants

 

January - December 2023 Niederaussem Power Plant – maintenance of the power plant

 

October 2022 The Netherlands – Disassembly, assembly and welding works on pipelines and manifold at Yara Sluiskil B.V

 

August-December 2022 Solvay Sodi production plants in Devnya, Bulgaria – moderniation of the superheater, assembly of the fuel storage and feeding system, the ash recirculation system and the DSI system as part of the K7 boiler modernization

 

June-December 2022 Olsztyn – installation of pipelines as part of the construction of the installation for thermal coversin of the energy fraction from municipal wase with the recovery of electricity and heat, along with accompanying infrastructure

 

April-August 2022 Bielsko-Biala – construction of a peak – reserve boiler room

 

April-June 2022 Hamburg – Disassembly and assembly works during the „Partial KB1 project/MP2 recovery boiler pipelines”

 

March-December 2022 Niederaussem Power Plant – maintenance of the power plant

 

March-December 2022 Weissenhorn – assembly and welding works

 

January-December 2022 Frankfurt – Assembly and welding works on the construction of two recovery boilers K7 and K8 for Infraserv GmbH Co Hochst KG in Industriepark Hochst in Frankfurt

 

January-December 2022 Bergkamen and Chemiepark Marl maintrance in 2022 in power plants

 

January-August 2022 Combined Heat and Power Plant in Olsztyn – installation of a flue gas cleaning installation

 

January-February 2022 Essen Power Plant– assembly and welding works

 

October-November 2021 RWE Weisweiler Power Plant – work on the reconstruction of the heart of block H

 

September-October 2021 BMC Moerdijk Power Plant - assembly and welding works

 

September 2021 AVR Rozenburg Power Plant – boiler assembly work in power plant

 

August 2021 Klemetsrud Power Plant – assembly works on boiler No. 3 in power plant

 

July-September 2021 Thyssenkrupp Werk Duisburg Schwelgern Plant – renovation work on electrostatic precipitator RE.2 of thhe belt sinter plant 3

 

June-August 2021 Niederaussem Power Plant – revision works on membranę walls

 

June 2021- ASN Nurnberg waste incineration plant – renovation works on line 2; replacement of the hopper in the incinerator with garbage

 

May – June 2019 Hayden Power Plant – disassembly and assembly works on coal burners

 

March – April 2019 PCK Raffinerie GmbH in Schwedt by Oder – assembly works

 

February – March 2019 ABE Amsterdam Waste Incineration Plant – revision works

 

January – February 2019 Chemical Plant Ludwigshafen – partial replacement of membrane walls of BASH

 

July – September 2018 Nideraussem Power Plant – revision of unit G

 

July – August  2018 Rostock Power Plant – disassembly and assembly works on outer portion of superheater 4

 

June 2018 – March 2019 Turów Power Plant – assembly of pipelines of Package 3

 

June 2018 Herten Waste Incineration Plant – repair of boiler 1 burning grate and replacement of gate valves on pipelines

 

January – December 2018 Evonik Industries AG Power Plant and Chemipark Marl – Operation sustaining works

 

September 2017 -  July 2018 Jaworzno Power Plant unit 910MW – assembly of pressure part of Package 4.1

 

September – October 2017 Nideraussem Power Plant – boiler repair works

 

May – July 2017 Dateln Power Plant – replacement of feed water orifice, pipelining of feed water system on unit 4

 

May – June 2017 Neurath Power Plant – Steam pipeline replacement including suspensions on E Power Unit

 

May 2017 Waste incineration plant in Elverlingsen – boiler walls replacement

 

May 2017 Waste incineration plant in Hannover – panels of boiler walls replacement, burners service

 

April – May 2017 Waste incineration in Herten – replacement of fuel feeder on burning grate

 

April – December 2017 Jaworzno Power Plant – assembly and welding of convection pipes coils and connection tubes (package II)

 

February – September 2017 Opole Power Plant – assembly of cooling water closed system on boiler 5 and 6 in PGE GiEK S.A. Opole Power Plant Department

 

January – December 2017 Chemipark Marl – service on power plant units

 

January – December 2017 Bergkamen Power Plant - service on power plant units

 

November – December 2016 Datteln Power Plant – repair and service of duct in electrostatic filter area on unit 4

 

November 2016 – March 2018 Jaworzno Power Plant – assembly and welding of boiler external piping (package III)

 

October – November 2016 Production workshop in Racibórz – assembly and welding of hanger-pipes on production department of Rafako S.A.

 

September 2016 – December 2017 Opole Power Plant – assembly of pipelines

 

July – September 2016 Reuter Berlin Heat-Electric Power Plant – revision works on boiler

 

July – August 2016 Zielona Góra Power Plant – elbows replacement on superheater headers

 

May 2016 EVONIK chemical consortium / Wesseling – assembly of pipelines for steam heater including connection of drop pipes to steam collector. Adaptation of drop pipes (assembly of T-pipes)

 

April – July 2016 Niederassem Power Plant – replacement of interstage superheater and revision works on pressurized parts of the boiler

 

April – June 2016 Schkopau Power Plant – replacement of second stage of superheater

 

March – December 2016 Works performer on workshop and on Saint Gobain territory – production of tools and auxiliary elements for production. Service works on pressurized elements.

 

January - February 2016 Spreerecycling Incineration Plant - replacement of overflow pipes and downpipes to improve efficiency of the boiler; pressure testing.


January 2016 AVG Hamburg Incineration Plant - installation of an automatic cleaning system for the boiler in the furnace chamber, installation of pipe bends in the walls of the 1st and 2nd boiler draught pass, reworking of the boiler drum overflow pipes.

 
December 2015 – January 2016 – Bełchatów Power Plant - installation of the load-bearing structure of the chamber, installation of the suspensions on the membrane wall, installation of several dozens of fixing points on the boiler membrane walls

 
November 2015 – February 2016 Bełchatów Power Plant - installation of air chambers for burners including joints – assembly package 5.2.

 
November – December 2015 Orion Engineered Carbons - inspection of the auxiliary boiler no 1.

 
November – December 2015 Metsa Tissue Krapkowice Paper Mill - disassembly of 139 flue pipes in the three-pass boiler including the machining of grid bottom.

 
September 2015 Spreerecycling Incineration Plant - installation of an automatic cleaning system for boiler #1 in the furnace chamber draught passage and replacement of silencer.

 
September – October 2015 KGHM Polska Miedź SA Głogów CHP Plant - reconditioning of the parts of waste heat boiler. Supply and assembly of boiler pipe shield plates. Wall surfacing

 
August 2015 – March 2016 Bełchatów Power Plant – dismantling and assembly of block no. 10 – assembly package 3.

 
June – December 2015 Chemiepark Marl – inspection of a power unit No. 5 of the power plant.

 
June – July 2015 Stalverk Lulea Steel Plant, Sweden – welding connections of the cooled duct parts above two BOFs at Stalverk Lulea steel plant.

 
May – August 2015 Synthos Dwory Oświęcim – installation of the bag filter including a supporting structure and a stairway together with installation and adjustment of an internal equipment of the fluidised bed boiler at Synthos Dwory 7.

 
May 2015 – Huckingen Power Plant – exchange of 35 afterburning air nozzles.

 
May 2015 – December 2015 Bełchatów Power Plant – dismantling and assembly of block no. 9 – assembly package 2.

 
April 2015 – Niederaussem Power Plant – sheet-metal works in block K.

 
March 2015 – December 2015 Bergkamen Power Plant – workshop and maintenance works in the power plant.

 
March 2015 – December 2015 Chemiepark Marl – workshop and maintenance works in the power plant.

 
March 2015 – March 2016 Niederaussem Power Plant – revision of H, F, K, B blocks.

 
March 2015 – April 2015 Stalowa Wola Power Plant – development of documentation for oil and water-steam pipeline routes for the turbine system of the energy block at Elektrownia Stalowa Wola power plant.

 
January – December 2015 Bergkamen Power Plant – ash removal at Bergkamen biomass power plant.

 
November 2014 – to date –Mehrum Power Plant – current overhauls and repairs of the pressure part of the boiler and the machine room pipelines at the power plant.

 
November 2014 – January 2015 Stalowa Wola Power Plant – installation of oil pipelines for a turbine system in a power block of Elektrociepłownia Stalowa Wola power and heating plant.

 
October - December 2014 Production facilities of Chemar Rurociagi Sp. zo.o. in Kielce - welding works ordered by Chemar Rurociagi Sp.zo.o.

 
August 2014 – December 2020 Bełchatów Power Plant – installation and maintenance works for units number 3 to 12 and the repair of consumable elements of power plant mills.

 
June – July 2014 Farge Power Plant – the installation of a pipeline and fittings of the interstage hot water heating system.

 
April – October 2014  Niederaußem Power Plant – the renovation of units C1 and C2 of boilers D and G.

 
March 2014 Buchen Power Plant – inspection works at BKO Buchen.

 
February – March 2014 Huckingen Power Plant – the inspection of unit A and B.

 
March – December 2014 Chemiepark Marl – permanent renovation services for steam boilers in the power plant units.

 
March – December 2014 Bergkamen Power Plant – maintaining supply line operation and ash removal within the inspection and elimination of malfunctions on a current basis.

 
January – June 2014 Bełchatów Power Plant – maintenance works for units 3, 4, 5, 7, 8.

 
January – June 2014 Bełchatów Power Plant – disassembly and assembly of a pressure part of unit 11 boiler.

 
August – October 2013 the city of Gliwice – assembly and welding of urban heating pipelines of DN 600, installation of switching stations in concrete chambers.

 
August – September 2013 Dolna Odra Power Plant – disassembly and assembly works for boiler 5.

 
August – September 2013 Huckingen Power Plant -  TÜV Programm boiler 2.

 
July, September 2013 Altbach – replacement of pipes of superheater 2.

 
July – August 2013 Waste Incineration Plant, MVA Flingern – disassembly and assembly of a third line superheater.

 
June 2013 Jaworzno 2 Power Plant – assembly of steel construction, connecting and sealing elements.

 
March 2013 – February 2014 Chemiepark Marl – line maintenance for power plant units.

 
June – September 2013 Łagisza Power Plant – major repair of boiler 7.

 
April – June 2013 Niederaußem Power Plant – Unit E – partial replacement of superheater 4/5 walls.

 
March – December 2013 Aurubis Lünen – line maintenance.

 

January 2013 – January 2015 Bełchatów Power Plant – the maintenance of unit 14.


October 2012 Goldenberg Power Plant – Unit K – the inspection of unit K.

 
October 2012 Niederaußem Power Plant – Unit F – works related to the pressure part of a boiler.


September – December 2012 Flensburg Power Plant – reconstruction of boiler 5 of the local company, Flensburg.

 
August – October 2012 Altbach Power Plant – replacement of superheater pipes.

 
July – December 2012 Bełchatów Power Plant – unit 6 modernisation.

 
June – September 2012 Herne 4 Power Plant – reconstruction of burners and air channels to burners.
 

June – August 2012 Niederaußem Power Plant – Unit K – the inspection of a unit.

 
April – June 2012 Niederauβem Power Plant – Unit H – installation, welding works related to elements of the system used for installation or maintenance purposes at unit 7.

 
March 2012 – February 2014 Hülls Power Plant – maintenance of steam boiler installation for units of Chemiepark Mark Power Plant.

 
February – July 2012 Bełchatów Power Plant – disassembly and assembly of unit 7.